Eduardo Huedo
- Email:
- Registered on: 2009-06-03
- Last connection: 2012-02-15
Projects
- BES interface for GridWay (Manager, 2012-02-16)
- GridWay (Manager, Commiter, 2009-06-03)
Activity
Reported issues: 30
2012-02-15
- 16:36 GridWay Revision 510: Tagging 5.8.1
2012-02-09
- 23:49 GridWay Revision 503: Feature #113: FHS-compliant installation
- 16:51 GridWay Revision 499: Change in workflow example
- 16:49 GridWay Feature #113 (Assigned): FHS-compliant installation
2012-02-08
- 12:40 GridWay Feature #111 (Resolved): Show disk size and free space in GB when needed
- 12:39 GridWay Feature #112 (Resolved): Submit MPI jobs to GRAM4 with wrapper
- 11:54 GridWay Revision 498: Feature #111: Show disk size and free space in GB when needed
- 10:29 GridWay Revision 497: Feature #111: Show disk size and free space in GB when needed
- 10:28 GridWay Revision 496: Feature #112: Submit MPI jobs to GRAM4 with wrapper
- 10:19 GridWay Feature #112 (Resolved): Submit MPI jobs to GRAM4 with wrapper
- Requested by Shamjith K V:
...post wrapper actions can be included in the wrapper itself. But, in the case of MPI ...
Also available in: Atom